The Naze: A Coast Under Threat & the Fight to Save It

Simon Jones


Subscribe Contact us

The Naze is a unique headland that extends northwards from the seaside town of Walton-on-the-Naze. Derived from the old English word ‘naes’ meaning promontory or, quite literally, nose, the Naze is the most easterly peninsula in Essex. 


The Naze's extensive tidal creeks, islands, and salt marshes form part of the 2000 acre Hamford Water National Nature, a wetland of international importance for migratory birds. This evocative landscape was the inspiration for Arthur Ransome's 'Secret Water’, part of the Swallows and Amazons series.


The Naze cliffs are a designated a Site of Special Scientific Interest. Just a short stroll along the beach offers glimpses into its rich natural history, with sharks’ teeth, shells, and fossils scattered along the shore. The cliffs offer a fascinating strata, including London Clay formed about 50 million years ago in a subtropical sea and sands called the Red Crag from about 3 million years ago.


The Naze is also home to a diverse collection of wildlife. It is home to migratory and nesting birds such as the Dark Bellied Brent Goose, Sedge Warbler, and Whitethroat. There is also a large colony of seals. They can be seen sunbathing on mudflats in the backwaters or bobbing about in the waves. 


Beyond its environmental significance, the Naze is vital to the local community and visitors. It attracts 200,000 visitors each year. The Hamford Water area also provides local employment with a marine industry supporting 200 jobs for Walton, light industrial sites, and farmland contributing to the local economy. 


Coastal landscapes like the Naze are increasingly recognised for their intangible cultural value, providing communities with wellbeing and mental health benefits. The iconic Naze Tower, a Grade 2* listed navigation mark built in 1720, is a beloved landmark offering museum exhibits, an art gallery, a cafe, and educational visits about the history, geology, and erosion of the Naze.


Coast Under Threat


Unfortunately, this invaluable environment is under significant threat from coastal erosion. For many years, the rate of erosion was measured at 1.5 metres per year. Yet, in the last ten years, this has accelerated to between 3-5 metres in some areas. Extreme winter weather and tidal events, often compounded by surge events, drive much of this erosion. Heavy rain saturates the cliffs, causing increased slumping, while high tides with greater wave energy claw away soft cliff sediments. Beach sands are also constantly moving along the exposed shoreline. 


The soft sediment layers in the cliffs become waterlogged and wash out in the winter, leading to collapse that is then swept away by the sea. Even without sea effects, the cliffs are inherently unstable due to soil behaviour and stress changes. 


The policy on open coasts allows erosion, and government funding for sea defence typically focuses on protecting property, which the Naze, as an open coast area, does not normally qualify for.


At this accelerated rate, the north end of the Naze could be lost to the sea within ten years. This would mean the sea breaching into Hamford Water, permanently changing tidal flow and impacting the fragile salt marshes, wildlife, and all who enjoy and visit this environment. The accelerated erosion is already impacting areas near existing structures. 


Naze Protection Society


In response to these threats, the Naze Protection Society (NPS) was established in April 1997 as a registered charity.


The NPS is community-focused, representing local residents and visitors. Their task is to promote the issues, work to define solutions, attract community commitment, and guide the delivery of securing the future of the Naze. They believe proactive intervention is required. 


The society works through partnerships, bringing together experience, resources, and determination. From 1997 to 2010, they promoted the Crag Walk project, which was built between 2010 and 2011. This rock revetment was designed to secure the Naze Tower cliff frontage. The NPS raised £250,000 from the local community and visitors as the catalyst for the £1.2 million project, which also involved Tendring District Council (TDC), Frinton and Walton Town Council, and Essex Wildlife Trust. 


The NPS is now setting a new fundraising target of £25,000 a year to deliver soft-engineered structures and build resilience into the whole of the north beach area. They aim to reduce the erosion rate back to 1m/year average and provide resilience against climate change impacts between 2025-2050. 


Saving The Naze: The Cliffline Project


To update the community on their efforts and plans, the NPS is holding the Saving The Naze: The Cliffline Project  event. This community event, aligned with World Environment Day, will take place on Saturday, June 14, 2025, from 10am to 3pm at The Columbine Centre in Walton-on-the-Naze. 


The event aims to set out the NPS approach to the Cliffline Project, focusing on an affordable plan to slow erosion. It involves valuing everything the Naze and Hamford Water contribute to the community, wildlife, economy, and peace, and developing a plan using science, local expertise, and passion to adapt to the challenges of climate change.


To find out more, see the full agenda and reserve a space, visit the Eventbrite page: https://www.eventbrite.com/e/saving-the-naze-the-cliffline-project-tickets-1267463420209?aff=oddtdtcreator


How You Can Help the Naze


The Naze Protection Society relies on community support to carry out its work. You can help protect this unique environment for local people and visitors for future generations to enjoy.



To find out more about joining, volunteering, or donating, please visit the Naze Protection Society website: https://nazeprotectionsociety.org/


If you have any other questions, please use the form below.


Contact - SME Cyber Security article

Subscribe to our Newsletter

Blog Subscribe

SHARE CONTENT

Pembroke College lawn bathed in sunlight
by Tim Passingham 12 March 2026
CAMBRIDGE | See how Cambridge MC and Pembroke College are creating mutual value through a unique corporate partnership spanning student opportunities, academic collaboration and industry events | READ FULL CASE STUDY
Neon sharks made out of code.
by Simon Crimp 9 March 2026
Cyber Security | Ransomware in 2026 is a board-level resilience issue. Learn the key risks, weak spots and practical questions boards should ask to improve readiness, recovery and response.
The Top 21.2026 at the awards event in Cambridge, UK.
6 March 2026
The #21toWatch Top21.2026 winners have been announced at an awards ceremony at The Glasshouse innovation hub in Cambridge.
Asian business woman near a long window and looking at a tablet.
by Arianna Mortali 6 March 2026
BLOG | A student’s perspective on why women shouldn’t have to ‘play masculine’ to succeed at work – and how valuing empathy, confidence and inclusive leadership can help close gender gaps and build healthier organisations.
Abstract squiggle of circles
by Simon Crimp 19 February 2026
Where should leaders start with AI in 2026? A practical guide to moving beyond pilots, clarifying risk appetite, strengthening governance, improving data readiness, and delivering measurable enterprise value from AI at scale | READ FULL ARTICLE
Close up of a data centre stack with ports and wires visible
12 February 2026
We were approached by one of the fastest growing data centre providers in Europe. With over 20 data centres throughout the continent, they are consistently meeting the need for scalable, high-performance infrastructure. Despite this, a key data centre in Scandinavia had become reliant on a single, non-redundant 1 Gbps internet service from a local provider, posing significant risks to operational continuity. To enhance the reliability of its network and resolve these risks, our client needed to establish additional connectivity paths to ensure the redundancy of its infrastructure. The Ask Cambridge Management Consulting was engaged to address these connectivity challenges by identifying and evaluating potential vendors and infrastructure options to create second and third connectivity paths. This involved exploring various types of connectivity, including internet access, point-to-point capacity, wavelengths, and dark fibre. Additionally, Cambridge MC was asked to provide recommendations for building a local fibre network around the data centre to control and maintain diverse paths. This would allow the data centre to connect directly to nearby points of presence (PoPs) and reduce dependency on external providers, thereby enhancing network resilience and operational control. The goal of this project was to ensure that the Nordic data centre could maintain continuous operations even in the event of a failure in the primary connection. Approach & Skills Cambridge MC approached the project with a focus on ensuring operational continuity and resilience for the data centre. By identifying multiple connectivity paths, we aimed to mitigate the risk of network failures and ensure that the data centre could maintain continuous operations even in the event of a failure in the primary connection. This approach allowed Cambridge MC to provide a comprehensive solution to address both immediate and long-term connectivity needs. We employed a combination of Agile and Waterfall methodologies to manage the project. The initial investigative phase allowed a Waterfall approach, in which our team conducted thorough research and analysis to identify potential vendors and connectivity options. This phase involved detailed interviews with various telecommunications providers and an assessment of publicly available information. Once the initial analysis was complete, the workflow transitioned to an Agile approach for the implementation phase. This allowed Cambridge MC to adapt to new information and feedback from stakeholders, ensuring that the final solution was both flexible and robust. Challenges Lack of information: One of the primary obstacles we faced was the lack of detailed network maps and information from some of the potential vendors. To overcome this, the team conducted extensive interviews with contacts at these companies and leveraged its existing network of industry contacts to gather as much information as possible. Remote location: Another challenge was the remote location of the data centre, which limited the availability of local infrastructure and required us to explore creative solutions for connectivity. Cambridge MC addressed this by proposing the construction of a local fibre network around the data centre, which would allow for greater control and flexibility in connecting to nearby PoPs. Fragmented factors: Additionally, coordinating with multiple vendors and ensuring that their services could be integrated seamlessly posed a logistical challenge. We mitigated this by recommending a phased approach to implementation, starting with the most critical connectivity paths and gradually expanding to include additional options. Outcomes & Results Increased Connectivity: Cambridge MC successfully identified and evaluated multiple connectivity paths for the data centre. By exploring various types of connectivity, including internet access, point-to-point capacity, wavelengths, and dark fibre, we provided a comprehensive solution that significantly enhanced network resilience and reliability. Greater Control & Flexibility: Our recommendations for building a local fibre network around the data centre allowed for greater control and flexibility in connecting to nearby points of presence, ensuring continuous operations even in the event of a failure in the primary connection. New Vendors: The team’s extensive network of industry contacts and deep understanding of the regional telecommunications landscape allowed for a thorough and nuanced evaluation of potential vendors and connectivity options. Scope for Future Work: Cambridge MC identified several future developments with the potential to further enhance international connectivity and provide additional redundancy for the data centre. We also proposed further assistance, including a site visit for a more in-depth analysis of options, issuing RFI/RFP to vendors for capacity and fibre, and conducting similar connectivity studies for other candidate sites in the region.
Neon discs fading from blue to green to purple, cascading diagnolly across the screen.
by Cambridge Management Consulting 28 January 2026
Thames Freeport this week revealed the eight companies selected to participate in the Freeport’s Connectivity Lab, an initiative focused on validating commercially proven technologies in live port and logistics environments.
Aerial view of a data centre warehouse in the English countryside
by Duncan Clubb 13 January 2026
Author
by Matt Lawson 2 January 2026
Emerging as a hub for innovation, Thames Freeport is a unique initiative designed to stimulate trade and transform the lives of people in its region. Leveraging global connectivity and occupying a strategic position with intermodal capabilities across river, rail, and road, Thames Freeport has recognised its opportunity to drive economic regeneration for the local area. Thames Freeport engaged Cambridge Management Consulting to design a clear strategy for innovation over the next three to five years. Key considerations for this innovation strategy included objectives and KPIs, the future of the business ecosystem in the region, physical clusters and assets such as innovation hubs, and opportunities and challenges on the way. The Solution Working with our innovation partner, L Marks, Cambridge MC conducted an innovation strategy project which involved the following: Engaging with a range of stakeholders and partners from local authorities to corporate partners across the Thames Freeport area, leveraging interviews with key individuals to build a common picture of innovation aspirations, opportunities, and challenges. Conducting a series of workshops for the Thames Freeport team to consider visions and objectives, themes and focus areas, physical hubs and overall programme structure, and a three-year roadmap plan. Building a comprehensive innovation strategy which internalised all of the above questions. This was then presented to their board and formed the basis of the public tenders for innovation programmes that were then made public. 
More posts